skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Engineering study on conveyor system for HC-21C project

Technical Report ·
DOI:https://doi.org/10.2172/28218· OSTI ID:28218

The sludge stabilization process thermally stabilizes reactive plutonium bearing materials in a muffle furnace. This process is used to prepare the material for long term storage in the vaults. The process is conducted in Room 230A and 230B. The furnaces are located in glovebox HC-21C. Glovebox HC-21A is used for preparation of the charge and packaging of the high fired oxide. The feed for the process is located throughout the PRF and RMC-line gloveboxes, with over half of the feedstock currently being located in HA-23S. For readiness assessment, the sludge stabilization process at PFP was reviewed by the ALARA team to see how the process could be improved. One suggestion was made that the conveyor system be used to transfer items from HA-23S to the process glovebox (HA-21A) instead of sealing items in and out of the gloveboxes. The following discussion describes and compares past and current methods. In addition, actions are addressed that would need to be completed before the conveyor method could be used. The transportation of the feedstock to the process and all the different influencing factors will be examined to determine the best method. This assessment is being performed considering only the current campaign for HC-21C. However, there is a possibility that in the future, additional furnaces will be installed and further campaigns done.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
28218
Report Number(s):
WHC-SD-CP-ES-166; ON: DE95007227; TRN: 95:008310
Resource Relation:
Other Information: PBD: 2 Feb 1995
Country of Publication:
United States
Language:
English