Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing
This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 28214
- Report Number(s):
- WHC-SD-WM-ATR-093; ON: DE95007198; TRN: 95:008300
- Resource Relation:
- Other Information: PBD: 6 Feb 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing
Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing