Radiological consequences of a postulated drop of a maximally Lloaded FFTF fuel cask
Onsite and site boundary radiological consequences were estimated for a postulated accidental drop of an Interim Storage Cask (ISC) loaded 7 assemblies at the maximum available burnup. The postulated cask drop was assumed to occur from the maximum physically attainable height during crane movement of the cask. The resulting onsite and site boundary doses of 45 mSv and 0.04 mSv are far below the corresponding 1 Sv and 250 mSv risk guidelines for highly unlikely accidents
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 264031
- Report Number(s):
- WHC-SD-FF-TA-040; ON: DE96050015; TRN: 95000015
- Resource Relation:
- Other Information: PBD: 22 Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Radiological consequences of a hypothetical disruption of a maximally loaded FFTF fuel cask
Design review report FFTF interim storage cask
Analysis of Radiological Consequences of Postulated Releases from the IEM Cell
Technical Report
·
Fri Sep 22 00:00:00 EDT 1995
·
OSTI ID:264031
Design review report FFTF interim storage cask
Technical Report
·
Tue Jan 03 00:00:00 EST 1995
·
OSTI ID:264031
Analysis of Radiological Consequences of Postulated Releases from the IEM Cell
Technical Report
·
Wed Nov 06 00:00:00 EST 2002
·
OSTI ID:264031