Conceptual design plans for the FY 1993 line items
This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.
- Research Organization:
- EG and G Mound Applied Technologies, Miamisburg, OH (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC24-88DP43495
- OSTI ID:
- 263008
- Report Number(s):
- MLM-MU-88-72-0002; ON: DE96013363; TRN: 96:004264
- Resource Relation:
- Other Information: PBD: 22 Dec 1988
- Country of Publication:
- United States
- Language:
- English
Similar Records
Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation
Conceptual design report for environmental, safety and health phase III FY-91 line item