skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Pre-operational safety appraisal Tritiated Scrap Recovery Facility, Mound facility

Technical Report ·
DOI:https://doi.org/10.2172/255003· OSTI ID:255003

The purpose of this report is to identify, assess, and document the hazards which are associated with the proposed operation of the Tritiated Scrap Recovery Facility at Mound Facility. A Pre-operational Safety Appraisal is a requirement as stated in Department of Energy Order 5481.1, Safety Analysis and Review System. The operations to be conducted in the new Tritiated Scrap Waste Recovery Facility are not new, but a continuation of a prime mission of Mound`s i.e. recovery of tritium from waste produced throughout the DOE complex. The new facility is a replacement of an existing process started in the early 1960`s and incorporates numerous design changes to enhance personnel and environmental safety. This report also documents the safety of a one time operation involving the recovery of tritium from material obtained by the Department of Energy from the State of Arizona. This project will involve the processing of 240,000 curies of tritium contained in glass ampoules that were to be used in items such as luminous dial watches. These were manufactured by the now defunct American Atomics Corporation, Tucson, Arizona.

Research Organization:
Monsanto Research Corp., Miamisburg, OH (United States). Mound
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-76DP00053
OSTI ID:
255003
Report Number(s):
MLM-ML-81-51-0001; ON: DE96012387; TRN: 96:004027
Resource Relation:
Other Information: PBD: [1996]
Country of Publication:
United States
Language:
English