Success in horizontal barrier developments
Conference
·
OSTI ID:245620
- Brown and Root Environmental, Houston, TX (United States)
- Fluor Daniel Environmental Restoration Management Corp., Fernald, OH (United States)
- USDOE Fernald Field Office, OH (United States)
A successful proof of concept demonstration has been conducted of operational methods and tooling for the in situ construction of underground horizontal barriers for the control and containment of groundwater and contamination. The method involves jet grouting with specially adapted tools guided between twin, parallel wells for the placement of a grout beneath a waste site. The objective of the work is to develop reliable methods of constructing extensive, competent horizontal barriers underneath waste sites without excavating or penetrating the waste during the process.
- Research Organization:
- Fluor Daniel Environmental Restoration Management Corp., Fernald, OH (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC24-92OR21972
- OSTI ID:
- 245620
- Report Number(s):
- FEMP-2491; CONF-960212-92; ON: DE96011897
- Resource Relation:
- Conference: Waste management `96: HLW, LLW, mixed wastes and environmental restoration - working towards a cleaner environment, Tucson, AZ (United States), 25-29 Feb 1996; Other Information: PBD: [1996]
- Country of Publication:
- United States
- Language:
- English
Similar Records
Demonstration of in situ-constructed horizontal soil containment barrier at Fernald
Horizontal grout barrier project results of the latest testing
In situ construction of horizontal soil containment barrier at Fernald
Conference
·
Mon Aug 01 00:00:00 EDT 1994
·
OSTI ID:245620
+1 more
Horizontal grout barrier project results of the latest testing
Conference
·
Wed Mar 01 00:00:00 EST 1995
·
OSTI ID:245620
In situ construction of horizontal soil containment barrier at Fernald
Conference
·
Sat Apr 01 00:00:00 EST 1995
·
OSTI ID:245620