Title: Preliminary report: NIF laser bundle review

Technical Report ·
DOI:https://doi.org/10.2172/203474· OSTI ID:203474

As requested in the guidance memo {sup 1}, this committe determined whether there are compelling reasons to recommend a change from the NIF CDR baseline laser. The baseline bundle design based on a tradeoff between cost and technical risk, which is replicated four times to create the required 192 beams. The baseline amplifier design uses bottom loading 1{times}4 slab and flashlamp cassettes for amplifier maintenance and large vacuum enclosures (2.5m high {times} 7m wide in cross-section for each of the two spatial filters in each of the four bundles. The laser beams are arranged in two laser bays configured in a u-shape around the target area. The entire bundle review effort was performed in a very short time (six weeks) and with limited resources (15 personnel part-time). This should be compared to the effort that produced the CDR design (12 months, 50 to 100 personnel). This committee considered three alternate bundle configurations (2{times}2, 4{times}2, and 4{times}4 bundles), and evaluated each bundle against the baseline design using the seven requested issues in the guidance memo: Cost; schedule; performance risk; maintainability/operability; hardware failure cost exposure; activation; and design flexibility. The issues were reviewed to identify differences between each alternate bundle configuration and the baseline.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
203474
Report Number(s):
UCRL-ID-122317; ON: DE96003634; TRN: 96:008530
Resource Relation:
Other Information: PBD: 31 Aug 1995
Country of Publication:
United States
Language:
English