Fiscal year 1996 U.S. Department of Energy, Richland Operations Office Site summary baseline
The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that perform the functions described earlier; and verification ensuring the system satisfies the requirements and fulfills the functions. The above information is supplemented with the following: interface data; risk analyses and watch lists; assumptions; and required analyses.
- Research Organization:
- USDOE Richland Operations Office, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 201734
- Report Number(s):
- DOE/RL-107; ON: DE96006852; TRN: 96:008787
- Resource Relation:
- Other Information: PBD: Oct 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Spent Nuclear Fuel Project technical baseline document. Volumes 1--4, FY 1994
Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description