Title: Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee

Abstract

The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the Proposed Interim Storage of Enriched Uranium Above the Maximum Historical Storage Level at the Y-12 Plant, Oak Ridge, Tennessee (DOE/EA-0929, September, 1994). The EA evaluates the environmental effects of transportation, prestorage processing, and interim storage of bounding quantities of enriched uranium at the Y-12 Plant over a ten-year period. The State of Tennessee and the public participated in public meetings and workshops which were held after a predecisional draft EA was released in February 1994, and after the revised pre-approval EA was issued in September 1994. Comments provided by the State and public have been carefully considered by the Department. As a result of this public process, the Department has determined that the Y-12 Plant-would store no more than 500 metric tons of highly enriched uranium (HEU) and no more than 6 metric tons of low enriched uranium (LEU). The bounding storage quantities analyzed in the pre-approval EA are 500 metric tons of HEU and 7,105.9 metric tons of LEU. Based on-the analyses in the EA, as revised by the attachment to the Finding of No Significant Impact (FONSI), DOE has determined that interim storage ofmore » 500 metric tons of HEU and 6 metric tons of LEU at the Y-12 Plant does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an Environmental Impact Statement (EIS) is not required and the Department is issuing this FONSI.« less

Publication Date:
Research Org.:
US Department of Energy (USDOE), Washington DC (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
161462
Report Number(s):
DOE/EA-0929
ON: DE96003207; NC: NONE; TRN: AHC29601%%17
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1995]
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; 29 ENERGY PLANNING AND POLICY; Y-12 PLANT; STORAGE FACILITIES; ENVIRONMENTAL IMPACTS; HIGHLY ENRICHED URANIUM; STORAGE; SLIGHTLY ENRICHED URANIUM; INVENTORIES; NUCLEAR WEAPONS DISMANTLEMENT; RADIATION ACCIDENTS; TRANSPORT; TRANSPORTATION SYSTEMS

Citation Formats

. Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee. United States: N. p., 1995. Web. doi:10.2172/161462.
. Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee. United States. https://doi.org/10.2172/161462
. 1995. "Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee". United States. https://doi.org/10.2172/161462. https://www.osti.gov/servlets/purl/161462.
@article{osti_161462,
title = {Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee},
author = {},
abstractNote = {The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the Proposed Interim Storage of Enriched Uranium Above the Maximum Historical Storage Level at the Y-12 Plant, Oak Ridge, Tennessee (DOE/EA-0929, September, 1994). The EA evaluates the environmental effects of transportation, prestorage processing, and interim storage of bounding quantities of enriched uranium at the Y-12 Plant over a ten-year period. The State of Tennessee and the public participated in public meetings and workshops which were held after a predecisional draft EA was released in February 1994, and after the revised pre-approval EA was issued in September 1994. Comments provided by the State and public have been carefully considered by the Department. As a result of this public process, the Department has determined that the Y-12 Plant-would store no more than 500 metric tons of highly enriched uranium (HEU) and no more than 6 metric tons of low enriched uranium (LEU). The bounding storage quantities analyzed in the pre-approval EA are 500 metric tons of HEU and 7,105.9 metric tons of LEU. Based on-the analyses in the EA, as revised by the attachment to the Finding of No Significant Impact (FONSI), DOE has determined that interim storage of 500 metric tons of HEU and 6 metric tons of LEU at the Y-12 Plant does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an Environmental Impact Statement (EIS) is not required and the Department is issuing this FONSI.},
doi = {10.2172/161462},
url = {https://www.osti.gov/biblio/161462}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Dec 01 00:00:00 EST 1995},
month = {Fri Dec 01 00:00:00 EST 1995}
}