skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: NuMI proton kicker extraction system

Conference ·
OSTI ID:15017167

This system extracts up to 9.6 {micro}s of 120 GeV beam every 1.87 seconds for the NuMI beamline neutrino experiments. A pulse forming network consisting of two continuous wound coils and 68 capacitors was designed and built to drive three kicker magnets. The field stability requirement is better than {+-} 1% with a field rise time of 1.52 {micro}s. New kicker magnets were built based on the successful traveling wave magnets built for the Main Injector. Two of these magnets are in series which places a serious constraint on the rise time of the pulser. A forced cooling system using Fluorinert{reg_sign} was designed for the magnet termination resistors to maintain the field flatness and amplitude stability.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76CH03000
OSTI ID:
15017167
Report Number(s):
FERMILAB-CONF-05-146-AD; TRN: US200606%%396
Resource Relation:
Conference: To appear in the proceedings of Particle Accelerator Conference (PAC 05), Knoxville, Tennessee, 16-20 May 2005
Country of Publication:
United States
Language:
English

Similar Records

NuMI proton kicker extraction magnet termination resistor system
Conference · Sun May 01 00:00:00 EDT 2005 · OSTI ID:15017167

AGS booster tune meter kickers
Conference · Tue Jan 01 00:00:00 EST 1991 · OSTI ID:15017167

Design of kicker/bumper magnet and PFN for
Technical Report · Mon Dec 31 00:00:00 EST 1990 · OSTI ID:15017167