Beam 'notching' tests with the main ring super damper
The original operations scenario to provide 12 proton bunches for the accelerator studies in the fall had them injecting 12 partial Booster batches into the main ring, accelerating them to flattop, then coalescing them. One of the main limitations of these coalescing studies for the last few months has been the inability of the Booster to provide enough beam without radiation trips. These radiation trips are considered difficult to eliminate due to the fact that the unwanted Booster beam cannot be aborted cleanly. During last week's study period they successfully used a new method that shows much promise.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 15017147
- Report Number(s):
- FERMILAB-EXP-183; TRN: US200621%%333
- Country of Publication:
- United States
- Language:
- English
Similar Records
Some Suggested Techniques for Achieving Required Main Ring Low Level RF Performance for the Tevatron I Program
Abort kicker power supply systems at Fermilab
Barrier RF system and applications in Main Injector
Technical Report
·
Tue May 01 00:00:00 EDT 1984
·
OSTI ID:15017147
Abort kicker power supply systems at Fermilab
Conference
·
Sat Jun 01 00:00:00 EDT 1985
·
OSTI ID:15017147
+2 more
Barrier RF system and applications in Main Injector
Conference
·
Sun May 01 00:00:00 EDT 2005
·
OSTI ID:15017147
+1 more