Specific PVMaT R&D in CdTe Product Manufacturing: Final Subcontract Report, March 2003
Results of a 3+ year subcontract are presented. The research was conducted under Phase 5A2 of the subcontract. The three areas of effort in the subcontract were (1) manufacturing line improvements, (2) product readiness, and (3) environmental, safety, and health programs. The subcontract consisted of three phases, approximately 1 year each. Phase I included the development, design, and implementation of a high-throughput, low-cost lamination process. This goal was achieved using the support of key experts such as Automation and Robotics Research Institute (ARRI) to identify appropriate lamination equipment vendors, and material handling. Product designs were reviewed by Arizona State University Photovoltaic Testing Laboratory and Underwriters Laboratories. Modifications to the module designs were implemented to meet future testing requirements. A complete review of the Environmental, Health, and Safety programs was conducted, along with training by the Environmental Protection Agency (EP A) and Occupational Safety and Health Administration (OSHA). Work conducted during Phase II included the implementation of an improved potting procedure for the wiring junction. The design of the equipment focused on high-throughput, low-cost operations. During Phase III , First Solar made significant progress in three areas: Manufacturing Readiness; Product Performance; and Environmental, Health, and Safety (EH&S). First Solar's accomplishments in laser scribing significantly exceeded the stated goals. Innovations implemented during Phase III were made possible by adopting a new type of high-frequency, low-pulse-width laser, galvanometer-driven laser-beam system, and numerous advanced, automated, equipment features. Because of the greater than one order of magnitude increase in the throughput and laser life, a factor of two decrease in equipment cost, and complete automation, a major impact on lowering the cost of the PV product is anticipated.
- Research Organization:
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC36-99-GO10337
- OSTI ID:
- 15006545
- Report Number(s):
- NREL/SR-520-35177; ZAX-8-17647-06; TRN: US200411%%281
- Resource Relation:
- Other Information: PBD: 1 Jan 2004; Related Information: Work performed by First Solar, LLC, Perrysburg, Ohio
- Country of Publication:
- United States
- Language:
- English
Similar Records
PowerGuard(R) Advanced Manufacturing: PVMaT Final Report, 1 July 1998 - 30 September 2001
Specific PVMaT R and D in CdTe Product Manufacturing; Phase II Annual Subcontract Technical Report; May 1999--September 2000
Related Subjects
36 MATERIALS SCIENCE
42 ENGINEERING
AUTOMATION
DESIGN
IMPLEMENTATION
LASERS
MANUFACTURING
MODIFICATIONS
PERFORMANCE
POTTING
SAFETY
TESTING
TRAINING
US EPA
US OSHA
SOLAR ENERGY
PV
MANUFACTURER
MANUFACTURING LINE IMPROVEMENTS
PRODUCT READINESS
LAMINATION PROCESS
WIRING JUNCTION
COST REDUCTION
LASER SCRIBING
MODULE
SOLAR ENERGY - PHOTOVOLTAICS