skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

Technical Report ·
DOI:https://doi.org/10.2172/15004842· OSTI ID:15004842

This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

Research Organization:
National Renewable Energy Lab. (NREL), Golden, CO (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC36-99-GO10337
OSTI ID:
15004842
Report Number(s):
NREL/TP-560-34870; TRN: US200321%%269
Resource Relation:
Other Information: PBD: 1 Sep 2003
Country of Publication:
United States
Language:
English