The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.
The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability.
The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability.
18 Data Resources
Name | Size | Type | Resource Description | History |
---|---|---|---|---|
5.1 Drivetrain Commissioning.zip | 876.45 MB | Archive | TDMS Files. The drivetrain commissioning test sequence ensured that the dynamometer controls, drivetrain, gearbox, lubrication and cooling systems and instrumentation were all operating normally and ready for full-load testing. | |
5.2.1 Static Bending Moment Static NTL Test Log.xlsx | 129.01 KB | Data | Log of Static Bending Moment Tests | |
5.2.1.1 Static Bending Moment .055 Speed Normal.zip | 105.93 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% power. | |
5.2.1.2 Static Bending Moment .055 Speed Reverse.zip | 109.61 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% reverse power. | |
5.2.1.3 Static Bending Moment 0 Power.zip | 506.88 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 0% power. | |
5.2.1.4 Static Bending Moment 0.25 Power.zip | 539.28 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted at 25% power. | |
5.2.1.5 Static Bending Moment 0.50 Power.zip | 529.72 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted at 50% power. | |
5.2.1.6 Static Bending Moment 0.75 Power.zip | 524.99 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted at 75% power. | |
5.2.1.7 Static Bending Moment 1.00 Power.zip | 568.28 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted at 100% power. | |
5.2.1.8 Static Bending Moment 0.10 Power.zip | 106.98 MB | Archive | TDMS Files. Static bending moment tests for GB3 were conducted at 10% power. | |
5.2.2 Dynamic Bending Moment.zip | 94.1 MB | Archive | TDMS Files. Dynamic bending moment tests for GB3 will be completed in offline (sequence 1), 25%-power (sequence 2), and 100%-power (sequence 3) conditions. | |
5.2.3 Static Thrust.zip | 124.99 MB | Archive | TDMS Files. Static thrust testing test sequences were completed in offline mode (sequence 2), at 25%-power (sequence 3), 50%-power (sequence 4), 75%-power (sequence 5), and 100%-power (sequence 6) conditions. | |
5.4 Field Representative.zip | 152.77 KB | Archive | TDMS Files. Reproduction of field conditions in the dynamometer was achieved in Phase 3 testing of GB2 using the dynamometer variable frequency drive capability. The same normal power production and shutdown cases tests will be repeated for GB3. | |
5.5 Grid Disconnect.zip | 81 KB | Archive | TDMS Files. Controlled shutdowns tests were also completed on November 3, 2016. While operating at a steady-state power level, the dynamometer was intentionally shut down in a controlled fashion. | |
5.3 Generator Misalignment.zip | 26.36 KB | Archive | TDMS Files. In Phase 3 testing of GB2, the generator was misaligned up to 3° to assess whether excessive loads were imparted onto the HSS bearings. | |
2D Drawings.zip | 37.24 MB | Archive | PDF Format. Engineering drawings of GRC gearbox (GB) 3 showing basic part dimensions, characteristics and assembly procedures. | |
3D Models.zip | 465.34 MB | Archive | Solidworks Format. Solid body models of GRC gearbox (GB) 3 for visualization and other analyses. | |
Test Report | 0 KB | Website | This test report describes the recent tests of GRC gearbox (GB) 3 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan. |
Keywords
Submitted
• Dec •
21
2016
National Renewable Energy Laboratory
Cite This Dataset
Keller, Jonathan, and Robb Wallen. 2016. "Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test." NREL Data Catalog. Golden, CO: National Renewable Energy Laboratory. Last updated: September 16, 2022. DOI: 10.7799/1337868.
About This Dataset
56
10.7799/1337868
Public
09/16/2022
DOE Project
FY16 AOP 30231 1.5.2.401 Wind Turbine Drivetrain Reliability
Funding Organization
Department of Energy (DOE)
Research Areas
Wind Energy
License
View License
Digital Object Identifier
10.7799/1337868