Title: 700 kW Main Injector Operations for NOvA at FNAL

Abstract

Following a successful career as an antiproton storage and cooling ring, the Fermilab Recycler was repurposed as a proton stacker as part of the NOvA project, in order to increase the maximum NuMI beam power from 400 kW to 700 kW. Using the Recycler to prepare beam for acceleration in the Main Injector, we have been able to increase the beam power delivered to NuMI to a sustained weekly average in excess of 400 kW and a best hourly average of 482.8 kW. I discuss the commissioning progress to date, and describe the remaining steps along the way to achieving the 700 kW design goal.

Authors:
 [1]
  1. Fermilab
Publication Date:
Research Org.:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), High Energy Physics (HEP)
OSTI Identifier:
1250808
Report Number(s):
FERMILAB-CONF-15-637-AD
1417544
DOE Contract Number:  
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 6th International Particle Accelerator Conference, Richmond, Virginia, USA, 05/03-05/08/2015
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS

Citation Formats

Adamson, Philip. 700 kW Main Injector Operations for NOvA at FNAL. United States: N. p., 2015. Web.
Adamson, Philip. 700 kW Main Injector Operations for NOvA at FNAL. United States.
Adamson, Philip. 2015. "700 kW Main Injector Operations for NOvA at FNAL". United States. https://www.osti.gov/servlets/purl/1250808.
@article{osti_1250808,
title = {700 kW Main Injector Operations for NOvA at FNAL},
author = {Adamson, Philip},
abstractNote = {Following a successful career as an antiproton storage and cooling ring, the Fermilab Recycler was repurposed as a proton stacker as part of the NOvA project, in order to increase the maximum NuMI beam power from 400 kW to 700 kW. Using the Recycler to prepare beam for acceleration in the Main Injector, we have been able to increase the beam power delivered to NuMI to a sustained weekly average in excess of 400 kW and a best hourly average of 482.8 kW. I discuss the commissioning progress to date, and describe the remaining steps along the way to achieving the 700 kW design goal.},
doi = {},
url = {https://www.osti.gov/biblio/1250808}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Jun 01 00:00:00 EDT 2015},
month = {Mon Jun 01 00:00:00 EDT 2015}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: