skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Proposed Objectives and Tentative Schedule for Surface Circulation and Injection Testing of the Phase II Reservoir Test Facility – Nov. 20 to 25, 1991

Technical Report ·
DOI:https://doi.org/10.2172/1248139· OSTI ID:1248139
 [1];  [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

The following are proposed for the initial Test Facility commissioning and training operations. 1. Set up and test alarm modes on FIXDMACS program with an alarm print out to the guard shack. (automatic shut down is not installed). 2. Set up and test the control loop for fluid level control in the Production Separator using the feed pumps for circulation and using the 125 psig air system for a vapor supply. The list continues on in the document.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC52-06NA25396
OSTI ID:
1248139
Report Number(s):
LA-UR-15-29108-02
Country of Publication:
United States
Language:
English

Similar Records

D0 Experimental Area Emergency Backup Power and Generator Test
Technical Report · Thu Jan 24 00:00:00 EST 1991 · OSTI ID:1248139

FFTF (Fast Flux Test Facility) Fission Gas Monitor Computer System
Conference · Sat Aug 01 00:00:00 EDT 1987 · OSTI ID:1248139

Electronic emergency shut down system for well testing
Conference · Fri Dec 01 00:00:00 EST 1995 · OSTI ID:1248139

Related Subjects