Metlab Plant-Wide Assessment (Metlab in Wyndmoor, PA)
Program Document
·
OSTI ID:1215926
This OIT BestPractices case study describes the methods and results of a plant-wide energy assessment at Metlab's aircraft component manufacturing plant in Wyndmoor, PA. Recommendations derived from the assessment, if implemented, can save an estimated $528,400 annually, reduce natural gas use by 50,070 MMbtu per year, and reduce electrical use by 329,400 kWh per year.
- Research Organization:
- EERE Publication and Product Library, Washington, D.C. (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Advanced Manufacturing Office (EE-5A) (Advanced Manufacturing Office Corporate)
- OSTI ID:
- 1215926
- Report Number(s):
- DOE/GO-102002-1619; 406
- Country of Publication:
- United States
- Language:
- English
Similar Records
Metlab Plan-Wide Assessment. Office of Industrial Technologies (OIT) BestPractices Assessment Case Study
Georgia-Pacific Palatka Plant Uses Thermal Pinch Analysis and Evaluates Water Reduction in Plant-Wide Energy Assessment
Martinez Refinery Completes Plant-Wide Energy Assessment
Technical Report
·
Thu Aug 01 00:00:00 EDT 2002
·
OSTI ID:1215926
Georgia-Pacific Palatka Plant Uses Thermal Pinch Analysis and Evaluates Water Reduction in Plant-Wide Energy Assessment
Program Document
·
Sun Dec 01 00:00:00 EST 2002
·
OSTI ID:1215926
Martinez Refinery Completes Plant-Wide Energy Assessment
Program Document
·
Fri Nov 01 00:00:00 EST 2002
·
OSTI ID:1215926