Ramping Effect on Forecast Use: Integrated Ramping as a Mitigation Strategy; NREL (National Renewable Energy Laboratory)
Abstract
Power generation ramping between forecasted (net) load set-points shift the generation (MWh) from its scheduled values. The Integrated Ramping is described as a method that mitigates this problem.
- Authors:
- Publication Date:
- Research Org.:
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE)
- OSTI Identifier:
- 1215336
- Report Number(s):
- NREL/PR-6A20-64549
- Resource Type:
- Conference
- Resource Relation:
- Conference: Federal Energy Regulatory Commission (FERC) Technical Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved Software, 23 June 2015, Washington, D.C.
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 24 POWER TRANSMISSION AND DISTRIBUTION; Power generation scheduling; Energy forecast; Automatic Generation Control
Citation Formats
Diakov, Victor, Barrows, Clayton, Brinkman, Gregory, Bloom, Aaron, and Denholm, Paul. Ramping Effect on Forecast Use: Integrated Ramping as a Mitigation Strategy; NREL (National Renewable Energy Laboratory). United States: N. p., 2015.
Web.
Diakov, Victor, Barrows, Clayton, Brinkman, Gregory, Bloom, Aaron, & Denholm, Paul. Ramping Effect on Forecast Use: Integrated Ramping as a Mitigation Strategy; NREL (National Renewable Energy Laboratory). United States.
Diakov, Victor, Barrows, Clayton, Brinkman, Gregory, Bloom, Aaron, and Denholm, Paul. 2015.
"Ramping Effect on Forecast Use: Integrated Ramping as a Mitigation Strategy; NREL (National Renewable Energy Laboratory)". United States. https://www.osti.gov/servlets/purl/1215336.
@article{osti_1215336,
title = {Ramping Effect on Forecast Use: Integrated Ramping as a Mitigation Strategy; NREL (National Renewable Energy Laboratory)},
author = {Diakov, Victor and Barrows, Clayton and Brinkman, Gregory and Bloom, Aaron and Denholm, Paul},
abstractNote = {Power generation ramping between forecasted (net) load set-points shift the generation (MWh) from its scheduled values. The Integrated Ramping is described as a method that mitigates this problem.},
doi = {},
url = {https://www.osti.gov/biblio/1215336},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 23 00:00:00 EDT 2015},
month = {Tue Jun 23 00:00:00 EDT 2015}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.