Title: Achieving safety/risk goals for less ATR backup power upgrades

Conference ·
OSTI ID:116705

The Advanced Test Reactor probabilistic risk assessment for internal fire and flood events defined a relatively high risk for a total loss of electric power possibly leading to core damage. Backup power sources were disabled due to fire and flooding in the diesel generator area with propagation of the flooding to a common switchgear room. The ATR risk assessment was employed to define options for relocation of backup power system components to achieve needed risk reduction while minimizing costs. The risk evaluations were performed using sensitivity studies and importance measures. The risk-based evaluations of relocation options for backup power systems saved over $3 million from what might have been otherwise considered {open_quotes}necessary{close_quotes} for safety/risk improvement. The ATR experience shows that the advantages of a good risk assessment are to define risk significance, risk specifics, and risk solutions which enable risk goals to be achieved at the lowest cost.

Research Organization:
EG and G Idaho, Inc., Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC07-94ID13223
OSTI ID:
116705
Report Number(s):
INEL-95/00275; CONF-951135-21; ON: DE96001711; TRN: 95:024481
Resource Relation:
Conference: 1995 International mechanical engineering congress and exhibition, San Francisco, CA (United States), 12-17 Nov 1995; Other Information: PBD: 1995