Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate
The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States); Raytheon Engineers and Constructors, Inc., Philadelphia, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 113880
- Report Number(s):
- WHC-SD-W113-FDR-001-Vol.4; ON: TI96000773; CNN: Contract MJJ-SVV-364162; TRN: 95:022210
- Resource Relation:
- Other Information: PBD: Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 5: Design validation assessments and lists
Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications
Related Subjects
HANFORD RESERVATION
RADIOACTIVE WASTE FACILITIES
COST ESTIMATION
STORAGE FACILITIES
WASTE RETRIEVAL
REMEDIAL ACTION
RADIOACTIVE WASTES
CAPITALIZED COST
SITE PREPARATION
CONCRETES
MECHANICAL STRUCTURES
EQUIPMENT
PIPES
POWER SUPPLIES
MEASURING INSTRUMENTS
CONTROL SYSTEMS
PAINTS
THERMAL INSULATION
COMPILED DATA