skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site

Abstract

Annual natural gas and produced water monitoring was conducted for gas wells adjacent to Section 36, where the Gasbuggy test was conducted, in accordance with the draft Long-Term Surveillance and Maintenance Plan for the Gasbuggy Site, Rio Arriba County, New Mexico. Sampling and analysis was conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites. (LMS/PLN/S04351, continually updated). Natural gas samples were collected for tritium and carbon-14 analysis. Produced water samples were collected and analyzed for tritium, gamma-emitting radionuclides (by high-resolution gamma spectrometry), gross alpha, and gross beta. An additional water sample was collected from well 29-6 Water Hole for analysis of tritium and gamma-emitting radionuclides. A duplicate produced water sample was collected from well 30-039-21743.

Authors:
 [1]
  1. S.M. Stoller Corporation, Broomfield, CO (United States)
Publication Date:
Research Org.:
S.M. Stoller Corp., Broomfield, CO (United States)
Sponsoring Org.:
USDOE Office of Legacy Management (LM)
OSTI Identifier:
1114525
Report Number(s):
LMS/GSB-S00710
TRN: US1400230
DOE Contract Number:  
AM01-07LM00060
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; 58 GEOSCIENCES; 61 RADIATION PROTECTION AND DOSIMETRY

Citation Formats

Plessinger, Mark. July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. United States: N. p., 2011. Web. doi:10.2172/1114525.
Plessinger, Mark. July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. United States. https://doi.org/10.2172/1114525
Plessinger, Mark. 2011. "July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site". United States. https://doi.org/10.2172/1114525. https://www.osti.gov/servlets/purl/1114525.
@article{osti_1114525,
title = {July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site},
author = {Plessinger, Mark},
abstractNote = {Annual natural gas and produced water monitoring was conducted for gas wells adjacent to Section 36, where the Gasbuggy test was conducted, in accordance with the draft Long-Term Surveillance and Maintenance Plan for the Gasbuggy Site, Rio Arriba County, New Mexico. Sampling and analysis was conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites. (LMS/PLN/S04351, continually updated). Natural gas samples were collected for tritium and carbon-14 analysis. Produced water samples were collected and analyzed for tritium, gamma-emitting radionuclides (by high-resolution gamma spectrometry), gross alpha, and gross beta. An additional water sample was collected from well 29-6 Water Hole for analysis of tritium and gamma-emitting radionuclides. A duplicate produced water sample was collected from well 30-039-21743.},
doi = {10.2172/1114525},
url = {https://www.osti.gov/biblio/1114525}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Jan 01 00:00:00 EST 2011},
month = {Sat Jan 01 00:00:00 EST 2011}
}