The transmission interface constraint problem. Revision
Electric power transmission systems exhibit a number of complex constraints on their operation and usage. When a network is subject to a constraint that limits the amount of power that can be moved from one region to another, there is said to be an interface limit. The power systems literature gives no general treatment of the engineering-economics of this ubiquitous phenomenon. Particular aspects of interface limits are typically discussed in sophisticated technical detail, but the general engineering-economic trade-offs involved in relieving interface constraints have not been systematically addressed. We approach this problem in the spirit of a heuristic model. Such models are quite valuable under current industry conditions because they delineate technical opportunities and choices in situations where there may be conflicting views among competing parties and regulatory authorities. We organize and enumerate the choices, clarify the practical conditions that dictate the optimum in particular cases, and help to motivate the final choices made by planners.
- Research Organization:
- Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00098
- OSTI ID:
- 109686
- Report Number(s):
- LBL-34772-Rev.; ON: DE96000872
- Resource Relation:
- Other Information: PBD: Oct 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
A linear model of voltage limited transmission interface constraints
Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs