Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado. Revision 1
For the UMTRA Project site located near Durango, Colorado (the Durango site), the Surface Project cleanup occurred from 1986 to 1991. An evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. Exposure could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. In addition, environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has mixed with contaminated ground water. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Durango site. The results of this report and further site characterization of the Durango site will be used to determine what is necessary to protect public health and the environment, and to comply with the EPA standards.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 106552
- Report Number(s):
- DOE/AL/62350-175-Rev.1; ON: DE96000237; TRN: 95:022100
- Resource Relation:
- Other Information: PBD: Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1
Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2