Bi-Directional Fast Charging Study Report
This report details the hardware and software infrastructure needed to demonstrate the possibility of utilizing battery power in plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) with a bi directional fast charger to support/offset peak building loads. This document fulfills deliverable requirements for Tasks 1.2.1.2, 1.2.1.3, and 1.2.1.4 of Statement of Work (SOW) No.5799 for Electric Transportation Engineering Corporation, now ECOtality North America (NA) support for the Idaho National Laboratory (INL).
- Research Organization:
- Idaho National Lab. (INL), Idaho Falls, ID (United States)
- Sponsoring Organization:
- DOE - EE
- DOE Contract Number:
- DE-AC07-05ID14517
- OSTI ID:
- 1042360
- Report Number(s):
- INL/EXT-12-24474; TRN: US201217%%2
- Country of Publication:
- United States
- Language:
- English
Similar Records
The development of a charge protocol to take advantage of off- and on-peak demand economics at facilities
2011 Chevrolet Volt VIN 0815 Plug-In Hybrid Electric Vehicle Battery Test Results
Battery Electric Vehicle Driving and Charging Behavior Observed Early in The EV Project
Technical Report
·
Wed Feb 01 00:00:00 EST 2012
·
OSTI ID:1042360
2011 Chevrolet Volt VIN 0815 Plug-In Hybrid Electric Vehicle Battery Test Results
Technical Report
·
Mon Jul 01 00:00:00 EDT 2013
·
OSTI ID:1042360
Battery Electric Vehicle Driving and Charging Behavior Observed Early in The EV Project
Conference
·
Sun Apr 01 00:00:00 EDT 2012
·
OSTI ID:1042360