skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cryogenic & Gas System Piping Pressure Tests (A Collection of PT Permits)

Technical Report ·
DOI:https://doi.org/10.2172/1033664· OSTI ID:1033664

This engineering note is a collection of pipe pressure testing documents for various sections of piping for the D-Zero cryogenic and gas systems. High pressure piping must conform with FESHM chapter 5031.1. Piping lines with ratings greater than 150 psig have a pressure test done before the line is put into service. These tests require the use of pressure testing permits. It is my intent that all pressure piping over which my group has responsibility conforms to the chapter. This includes the liquid argon and liquid helium and liquid nitrogen cryogenic systems. It also includes the high pressure air system, and the high pressure gas piping of the WAMUS and MDT gas systems. This is not an all inclusive compilation of test documentation. Some piping tests have their own engineering note. Other piping section test permits are included in separate safety review documents. So if it isn't here, that doesn't mean that it wasn't tested. D-Zero has a back up air supply system to add reliability to air compressor systems. The system includes high pressure piping which requires a review per FESHM 5031.1. The core system consists of a pressurized tube trailer, supply piping into the building and a pressure reducing regulator tied into the air compressor system discharge piping. Air flows from the trailer if the air compressor discharge pressure drops below the regulator setting. The tube trailer is periodically pumped back up to approximately 2000 psig. A high pressure compressor housed in one of the exterior buildings is used for that purpose. The system was previously documented, tested and reviewed for Run I, except for the recent addition of piping to and from the high pressure compressor. The following documents are provided for review of the system: (1) Instrument air flow schematic, drg. 3740.000-ME-273995 rev. H; (2) Component list for air system; (3) Pressure testing permit for high pressure piping; (4) Documentation from Run I contained in D-Zero Engineering note 3740.214-EN-268, John Urbin 11120/90; (5) Pressure test procedure; (6) Schematic for pressure test; and (7) List of component pressure ratings. The goal of this independent review is to: (1) Reviewer makes recommendation to the Division/Section Safety Officer to approve the testing permit; and (2) Reviewer is satisfied the FESHM 5031 is met, and recommends to the division head that approval to operate be granted.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1033664
Report Number(s):
FERMILAB-D0-EN-566; TRN: US1200648
Country of Publication:
United States
Language:
English

Similar Records

D0 Experimental Area Emergency Backup Power and Generator Test
Technical Report · Thu Jan 24 00:00:00 EST 1991 · OSTI ID:1033664

D-0 North End Cap Calorimeter Cold Test Results
Technical Report · Thu Aug 02 00:00:00 EDT 1990 · OSTI ID:1033664

CC Cryostat Cooldown Test Results
Technical Report · Fri Oct 16 00:00:00 EDT 1987 · OSTI ID:1033664