Title: D0 Silicon Upgrade: Pipe Sizing for Solenoid / VLPC Cryogenic Systems

Technical Report ·
DOI:https://doi.org/10.2172/1033315· OSTI ID:1033315

The addition of a solenoid magnet and VLPC detectors are two of a number of upgrades which will occur at the D-Zero detector in the near future. Both of these upgrades will require cryogenic services for their operation. The purpose of this engineering note is to document the pipe/tube size choices made for these cryogenic services. This was done by calculating the required flow rates to cool down the magnet and VLPC's over a reasonable length of time and to determine the required piping sizes for a given allowable pressure drop. The pressure drops for steady state conditions also are addressed. The cool down requirements drove the pipe size decision. The raw engineering calculations that were done for this project are included as an appendix to this note. The body of this document discusses the methods and results of the calculations. As a quick summary, Figures 1 and 2 show the size selections. Tables 1 and 2 give a more detailed size and description of each section of Solenoid and VLPC transfer line.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1033315
Report Number(s):
FERMILAB-D0-EN-416; TRN: US1200392
Country of Publication:
United States
Language:
English