D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures
This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1032084
- Report Number(s):
- FERMILAB-D0-EN-526; TRN: US1200451
- Country of Publication:
- United States
- Language:
- English
Similar Records
D0 Silicon Upgrade: D0 Central Tracking Solenoid: Specification for Solenoid Energization, controls, Interlocks and Quench Protection
D0 Central Tracking Solenoid Energizatino, Controls, Interlocks and Quench Protection Initial Validation Procedures
D0 Silicon Upgrade: Toroid Energization - Operating Procedures
Technical Report
·
Tue Jan 17 00:00:00 EST 1995
·
OSTI ID:1032084
D0 Central Tracking Solenoid Energizatino, Controls, Interlocks and Quench Protection Initial Validation Procedures
Technical Report
·
Tue Jan 27 00:00:00 EST 1998
·
OSTI ID:1032084
D0 Silicon Upgrade: Toroid Energization - Operating Procedures
Technical Report
·
Mon Jun 11 00:00:00 EDT 2001
·
OSTI ID:1032084