Title: D0 Cryo Instrument Air Backup System

Technical Report ·
DOI:https://doi.org/10.2172/1031827· OSTI ID:1031827

The D0 instrument air system for cryo controls has an emergency backup supply of nitrogen gas. The backup system consists of a high pressure tube trailer (38 tubes - 2400 psig MAWP), piping, valves, regulators and pressure monitoring instrumentation. The trailer is located south of DAB alongside the LN{sub 2} Dewar. Fixed piping ties to the trailer with a flex-hose. The piping follows the cryo piping bridge entering the south wall of DAB. where it passes through the pipe chase and into the cryo pump room (Rm 315). The high pressure gas is regulated down to 90 psig before tying into the compressor supplied instrument air system. Check valves are installed at the tee for the primary air and the backup N{sub 2}. Normal operating pressure for instrument air is 100-120 psig. With the backup supply pressure set to 90 psig, 'emergency air' is supplied whenever primary air pressure falls below 90 psig. There are two additional, outside connections to the system: one is a connection for repumping the trailer after a minimum backup volume is reached and the other is an auxiliary flex-hose connection for another trailer. All manual valves at system connections will be locked closed when not in use. The system's maximum allowable working pressure (MAWP) is 2400 psi, which is the trailer MAWP. All piping and components have a minimum 2400 psi working pressure. Actual component working pressures are included in the component list.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1031827
Report Number(s):
FERMILAB-D0-EN-268; TRN: US201201%%1016
Country of Publication:
United States
Language:
English

Similar Records

D0 Experimental Area Emergency Backup Power and Generator Test
Technical Report · Thu Jan 24 00:00:00 EST 1991 · OSTI ID:1031827

Cryogenic & Gas System Piping Pressure Tests (A Collection of PT Permits)
Technical Report · Thu Aug 22 00:00:00 EDT 2002 · OSTI ID:1031827

Cryo Utilities Room Cooling System
Technical Report · Thu Jan 26 00:00:00 EST 1989 · OSTI ID:1031827