This Engineering Note defines technical requirements and the scope of work for reattachment of the heads of the North EC cryostat This work is to be done in the D-Zero. Assembly Building (DAB) at Fermilab and is expected to begin around May 15, 1991. The task consists primarily of welding four heads onto a 17-foot diameter stainless steel double-wall pressure/varuum vessel. Nominal thicknesses of the welds are all 5/8-inch. Root passes are to be made by TIG welding and the balance by MIG welding. No radiography is required; other NDE per ASME Code, Section VIII, Div. 1. All work is to be done in accordance with the Rules of the National Board of Boiler and Pressure Vessel Inspectors (ANSI/NB-23), and repairs to the inner vessel are to be documented by the R-1 form exeruted by the Contractorts Authorized Inspector. The Contractor will be expected to work two shifts per day, five days per week to support the Fermilab schedule. Details of the cryostat are given on Fermi1ab Drawings 3740.220-ME-222256, Rev. R, 3740.224-ME-273071, and 3740.224-ME-273039. The cryostat was fabricated by Process Engineering, Inc. ofPlaistow, NH in 1989-90. The heads were removed using hand-held air-arc gouging equipment. As a result the welding grooves are not straight and their widths are not uniform, In some places the width may be as wide as 1-inch. For the purposes of quotation, the Contractor should assume a uniform weld groove as shown in Figure 1. The amount of weld metal to be deposited for this geometry is estimated to be 500 lbs. Upon completion, the final contract price will be determined by the following formula: Final Price = Contract Price x (lbs of weld metal deposited/500). Methods of determining the amount ofweld metal deposited will be agreed upon before award of the contract.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1031771
Report Number(s):
FERMILAB-D0-EN-307; TRN: US201201%%961
Country of Publication:
United States
Language:
English

Similar Records

Specification for the Reattachment of the EC South Cryostat Heads
Technical Report · Thu Aug 01 00:00:00 EDT 1991 · OSTI ID:1031771

CC Pressure Test
Technical Report · Thu Jul 12 00:00:00 EDT 1990 · OSTI ID:1031771

Endcap Calorimeter/Vessel Calculations
Technical Report · Wed Jan 01 00:00:00 EST 1986 · OSTI ID:1031771