Title: Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report, April 1--June 30, 1993

Abstract

Preliminary sketches of the furnace setting with dimensions and other appropriate data was distributed to appropriate boiler design groups. The purpose of this work was to define and/or establish unique mechanical and support requirements and furnace water circulation requirements. A preliminary convection pass arrangement and heating surface requirements were established. Initial computer runs indicate, as expected, that establishing even a preliminary arrangement to meet steam duty requirements was going to be a challenge. This due to slightly lower furnace exit gas temperatures (result of NO{sub x} control conditions) and higher final steam temperatures (results increasing plant efficiency) than typical of conventional design. Work on the furnace and convection pass design for the base preliminary unit was completed only to the extent necessary to identify design deficiencies, prepare an arrangement drawing and determine budgetary cost. Engineering work has been completed to the extent planned in this subtask for the base preliminary unit, Advanced Overfire Air, including preliminary designs for the furnace, convection pass, pulverizers, airheaters, flues and ducts, preliminary general arrangement drawings, and budgetary cost estimates. Work is nearly complete on design of the LEBS unit control system based on control methods and philosophy established in the NO{sub x} Control Subsystems.more » All appropriate information has been forwarded to Raytheon for use in completing BOP subsystem designs, site plot plans and preliminary generating plant cost analysis and comparison to a conventional plant.« less

Publication Date:
Research Org.:
Babcock and Wilcox Co., Barberton, OH (United States). Contract Research Div.
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10192101
Report Number(s):
DOE/PC/92160-T3
ON: DE94002163; BR: AA3520100
DOE Contract Number:  
AC22-92PC92160
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 23 Jul 1993
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; 01 COAL, LIGNITE, AND PEAT; COAL; COMBUSTION; BOILERS; AIR POLLUTION CONTROL; PLANNING; ENGINEERING; PROGRESS REPORT; 200202; 010800; NOXIOUS GAS AND PARTICULATE EMISSIONS; WASTE MANAGEMENT

Citation Formats

. Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report, April 1--June 30, 1993. United States: N. p., 1993. Web. doi:10.2172/10192101.
. Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report, April 1--June 30, 1993. United States. https://doi.org/10.2172/10192101
. 1993. "Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report, April 1--June 30, 1993". United States. https://doi.org/10.2172/10192101. https://www.osti.gov/servlets/purl/10192101.
@article{osti_10192101,
title = {Engineering development of advanced coal-fired low-emission boiler systems. Quarterly technical progress report, April 1--June 30, 1993},
author = {},
abstractNote = {Preliminary sketches of the furnace setting with dimensions and other appropriate data was distributed to appropriate boiler design groups. The purpose of this work was to define and/or establish unique mechanical and support requirements and furnace water circulation requirements. A preliminary convection pass arrangement and heating surface requirements were established. Initial computer runs indicate, as expected, that establishing even a preliminary arrangement to meet steam duty requirements was going to be a challenge. This due to slightly lower furnace exit gas temperatures (result of NO{sub x} control conditions) and higher final steam temperatures (results increasing plant efficiency) than typical of conventional design. Work on the furnace and convection pass design for the base preliminary unit was completed only to the extent necessary to identify design deficiencies, prepare an arrangement drawing and determine budgetary cost. Engineering work has been completed to the extent planned in this subtask for the base preliminary unit, Advanced Overfire Air, including preliminary designs for the furnace, convection pass, pulverizers, airheaters, flues and ducts, preliminary general arrangement drawings, and budgetary cost estimates. Work is nearly complete on design of the LEBS unit control system based on control methods and philosophy established in the NO{sub x} Control Subsystems. All appropriate information has been forwarded to Raytheon for use in completing BOP subsystem designs, site plot plans and preliminary generating plant cost analysis and comparison to a conventional plant.},
doi = {10.2172/10192101},
url = {https://www.osti.gov/biblio/10192101}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jul 23 00:00:00 EDT 1993},
month = {Fri Jul 23 00:00:00 EDT 1993}
}