skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Level maintenance for Tank 101-SY mitigation-by-mixing test. Revision 2

Technical Report ·
DOI:https://doi.org/10.2172/10189076· OSTI ID:10189076

The Phase A, Phase B and Full Scale testing portions of the Mitigation-By-Mixing Test have demonstrated the effectiveness of the Mixer Pump to maintain the waste in tank 101-SY in the desired mitigated state. The operation of the 101-SY Mixer Pump for short periods of time results in a controlled release of hydrogen gas in concentrations well below the established safety limits. Additionally, it has been shown that operation of the pump on a regular schedule minimizes the historical generation rate of hydrogen inventory in the waste. Generation of hydrogen inventory is exhibited by waste level growth. The primary objective of this procedure is to maintain the waste level in tank 241-SY-101 within the safe operating range as defined by the Safety Assessment and the Test Plan. The secondary objective is to operate the pump on a schedule that maximizes its useful lifespan and prevents the formation of obstructions in the normal flow path of the pump.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10189076
Report Number(s):
WHC-SD-WM-TPI-016-Rev.2; ON: DE95001410; BR: 35AF11201/35AF11202; TRN: AHC29501%%39
Resource Relation:
Other Information: PBD: 28 Sep 1994
Country of Publication:
United States
Language:
English