Level maintenance for Tank 101-SY mitigation-by-mixing test. Revision 2
The Phase A, Phase B and Full Scale testing portions of the Mitigation-By-Mixing Test have demonstrated the effectiveness of the Mixer Pump to maintain the waste in tank 101-SY in the desired mitigated state. The operation of the 101-SY Mixer Pump for short periods of time results in a controlled release of hydrogen gas in concentrations well below the established safety limits. Additionally, it has been shown that operation of the pump on a regular schedule minimizes the historical generation rate of hydrogen inventory in the waste. Generation of hydrogen inventory is exhibited by waste level growth. The primary objective of this procedure is to maintain the waste level in tank 241-SY-101 within the safe operating range as defined by the Safety Assessment and the Test Plan. The secondary objective is to operate the pump on a schedule that maximizes its useful lifespan and prevents the formation of obstructions in the normal flow path of the pump.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10189076
- Report Number(s):
- WHC-SD-WM-TPI-016-Rev.2; ON: DE95001410; BR: 35AF11201/35AF11202; TRN: AHC29501%%39
- Resource Relation:
- Other Information: PBD: 28 Sep 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Level maintenance for Tank 101-SY mitigation-by-mixing test
Mitigation of Tank 241-SY-101 by pump mixing: Results of testing phases A and B
Related Subjects
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
HANFORD RESERVATION
RADIOACTIVE WASTE STORAGE
SAFETY ENGINEERING
TANKS
LEVELS
DEGASSING
PUMPS
CONTROL
MIXING
RADIOACTIVE WASTES
OPERATION
SERVICE LIFE
OPTIMIZATION
054000
052002
HEALTH AND SAFETY
WASTE DISPOSAL AND STORAGE