Title: 241-U-701 new compressor building and instrument air piping analyses

Technical Report ·
DOI:https://doi.org/10.2172/10188192· OSTI ID:10188192

Building anchorage analysis is performed to qualify the design of the new compressor building foundation given in the ECN ``241-U-701 New Compressor Building.`` Recommendations for some changes in the ECN are made accordingly. Calculations show that the 6-in.-slab is capable of supporting the pipe supports, and that the building foundation, air compressor and dryer anchorage, and electric rack are adequate structurally. Analysis also shows that the instrument air piping and pipe supports for the compressed air system meet the applicable code requirements and are acceptable. The building is for the U-Farm instrument air systems.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10188192
Report Number(s):
WHC-SD-WM-DA-135; ON: DE95001231; BR: 35AF11201/35AF11202; TRN: 94:022645
Resource Relation:
Other Information: PBD: 25 Aug 1994
Country of Publication:
United States
Language:
English