Operating experience with high beta superconducting rf cavities
The number of installed and operational {beta} = 1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the US. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed.
- Research Organization:
- Southeastern Universities Research Association, Inc., Newport News, VA (United States). Continuous Electron Beam Accelerator Facility
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 10185002
- Report Number(s):
- DOE/ER/40150-234; CEBAF-PR-93-026; ON: DE93040860; TRN: 93:022907
- Resource Relation:
- Other Information: PBD: Jun 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records
Performance of SRF Systems in Large Scale Applications
Development work for a superconducting linear collider
A design and performance analysis tool for superconducting RF systems
Conference
·
Fri Oct 01 00:00:00 EDT 1993
·
OSTI ID:10185002
Development work for a superconducting linear collider
Conference
·
Sat Apr 01 00:00:00 EST 1995
·
OSTI ID:10185002
A design and performance analysis tool for superconducting RF systems
Conference
·
Thu May 01 00:00:00 EDT 1997
·
OSTI ID:10185002
+1 more