skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Seismic equipment qualification at Rocky Flats Plant: Lessons learned

Conference ·
OSTI ID:10183159

Seismic equipment qualification is being evaluated as a part of the Systematic Evaluation Program (SEP) at Rocky Flats Plant (RFP). Initially it was believed that the experience database developed by the Seismic Qualification Utility Group (SQUG) for commercial nuclear power plants, as outlined in their Generic Implementation Procedure (GIP), would provide a substantial benefit for the seismic adequacy verification of equipment at RFP. However, further review of the simplified guidelines contained in the GIP with respect to the specific RFP structures and components revealed substantial differences from the GIP criteria. Therefore, the number of ``outliers`` from the experience database defined in the GIP is greater than was initially anticipated. This paper presents details of the differences found between the RFP structures and components and those represented in the GIP, and the challenges presented for their evaluation at RFP. Approaches necessary to develop seismic verification data are also discussed. The discussions focus on experience with one of the nuclear facilities at RFP, Building 707. However, the conclusions are generally applicable to other similar facilities that typically comprise the RFP nuclear facilities.

Research Organization:
EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC34-90RF62349
OSTI ID:
10183159
Report Number(s):
RFP-4727; CONF-9310102-3; ON: DE93018799
Resource Relation:
Conference: 4. energy natural phenomena hazards mitigation conference,Atlanta, GA (United States),19-22 Oct 1993; Other Information: PBD: [1993]
Country of Publication:
United States
Language:
English