Title: UMTRA Project water sampling and analysis plan, Belfield and Bowman, North Dakota

Technical Report ·
DOI:https://doi.org/10.2172/10180537· OSTI ID:10180537

Surface remedial action is scheduled to begin at the Belfield and Bowman Uranium Mill Tailings Remedial Action (UMTRA) Project sites in the spring of 1996. Water sampling was conducted in 1993 at both the Belfield processing site and the Bowman processing/disposal site. Results of the sampling at both sites indicate that ground water conditions have remained relatively stable over time. Water sampling activities are not scheduled for 1994 because ground water conditions at the two sites are relatively stable, the 1993 sampling was comprehensive, and surface remediation activities are not scheduled to start until 1996. The next water sampling event is scheduled before the start of remedial activities and will include sampling selected monitor wells at both sites and several domestic wells in the vicinity.

Research Organization:
Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-91AL62350
OSTI ID:
10180537
Report Number(s):
DOE/AL/62350-135; ON: DE94018471; BR: EW2010102/EX2040010; TRN: 94:022624
Resource Relation:
Other Information: PBD: Aug 1994