skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Commissioning the new high power rf system for the AGS with high intensity beam

Conference ·
OSTI ID:10175863

A new high power rf system has been installed in the AGS in order to raise the beam loading limit to beyond 6 {times} 10{sup 13} protons per pulse. The old system was limited to 2.2 {times} 10{sup l3} ppp by: available real power, multi-loop instability, and transient beam loading during batch filling from the Booster. The key components of the new system are: new power amplifiers in the tunnel using the Thomson-CSF TH573 300kW tetrode, rf feedback around the power stage, and reduction of the 10 cavities` R/Q by 1.8 by additional gap capacitors. Commissioning of the new rf system with high intensity beam is described. The intensity goal for the 1994 running period is 4 {times} 10{sup 13} ppp. To date, 3.7 {times} 10{sup 13} ppp has been achieved.

Research Organization:
Brookhaven National Lab., Upton, NY (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
10175863
Report Number(s):
BNL-49812; CONF-940618-51; ON: DE94016789
Resource Relation:
Conference: EPAC 94 - 4. European particle accelerator conference,London (United Kingdom),27 Jun - 1 Jul 1994; Other Information: PBD: [1994]
Country of Publication:
United States
Language:
English