skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Tevatron lower temperature operation

Technical Report ·
DOI:https://doi.org/10.2172/10173938· OSTI ID:10173938

This year saw the completion of three accelerator improvement projects (AIP) and two capital equipment projects pertaining to the Tevatron cryogenic system. The projects result in the ability to operate the Tevatron at lower temperature, and thus higher energy. Each project improves a subsystem by expanding capabilities (refrigerator controls), ensuring reliability (valve box, subatmospheric hardware, and compressor D), or enhancing performance (cold compressors and coldbox II). In January of 1994, the Tevatron operated at an energy of 975 GeV for the first time. This was the culmination, of many years of R&D, power testing in a sector (one sixth) of the Tevatron, and final system installation during the summer of 1993. Although this is a modest increase in energy, the discovery potential for the Top quark is considerably improved.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
10173938
Report Number(s):
FNAL-TM-1890; ON: DE94016525; TRN: 94:015614
Resource Relation:
Other Information: PBD: Jul 1994
Country of Publication:
United States
Language:
English

Similar Records

Tevatron higher energy testing
Technical Report · Sun Oct 01 00:00:00 EDT 1995 · OSTI ID:10173938

Upgrade of the Tevatron cryogenic system
Conference · Sat Dec 31 00:00:00 EST 1994 · OSTI ID:10173938

Increasing the energy of the Fermilab Tevatron accelerator
Conference · Fri Jul 01 00:00:00 EDT 1994 · OSTI ID:10173938