Physics analysis of the gang partial rod drive event
During the routine positioning of partial-length control rods in Gang 3 on the afternoon of Monday, July 27, 1992, the partial-length rods continued to drive into the reactor even after the operator released the controlling toggle switch. In response to this occurrence, the Safety Analysis and Engineering Services Group (SAEG) requested that the Applied Physics Group (APG) analyze the gang partial rod drive event. Although similar accident scenarios were considered in analysis for Chapter 15 of the Safety Analysis Report (SAR), APG and SAEG conferred and agreed that this particular type of gang partial-length rod motion event was not included in the SAR. This report details this analysis.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 10173259
- Report Number(s):
- WSRC-TR-92-401; ON: DE93017293; TRN: 93:017931
- Resource Relation:
- Other Information: PBD: Aug 1992
- Country of Publication:
- United States
- Language:
- English
Similar Records
Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report
Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report
Control rod pattern exchange in a BWR/6 utilizing gang mode withdrawal
Conference
·
Sat Jan 01 00:00:00 EST 2011
·
OSTI ID:10173259
Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report
Conference
·
Tue Jan 01 00:00:00 EST 2008
·
OSTI ID:10173259
Control rod pattern exchange in a BWR/6 utilizing gang mode withdrawal
Conference
·
Wed Jan 01 00:00:00 EST 1986
· Trans. Am. Nucl. Soc.; (United States)
·
OSTI ID:10173259