skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Physics analysis of the gang partial rod drive event

Technical Report ·
DOI:https://doi.org/10.2172/10173259· OSTI ID:10173259

During the routine positioning of partial-length control rods in Gang 3 on the afternoon of Monday, July 27, 1992, the partial-length rods continued to drive into the reactor even after the operator released the controlling toggle switch. In response to this occurrence, the Safety Analysis and Engineering Services Group (SAEG) requested that the Applied Physics Group (APG) analyze the gang partial rod drive event. Although similar accident scenarios were considered in analysis for Chapter 15 of the Safety Analysis Report (SAR), APG and SAEG conferred and agreed that this particular type of gang partial-length rod motion event was not included in the SAR. This report details this analysis.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-89SR18035
OSTI ID:
10173259
Report Number(s):
WSRC-TR-92-401; ON: DE93017293; TRN: 93:017931
Resource Relation:
Other Information: PBD: Aug 1992
Country of Publication:
United States
Language:
English