Environmental Assessment for DOE permission for off-loading activities to support the movement of Millstone Unit 2 steam generator sub-assemblies across the Savannah River Site
The Department of Energy (DOE) has prepared an Environmental Assessment (EA), for the proposed granting of DOE permission of offloading activities to support the movement Millstone Unit 2 steam generator sub-assemblies (SGSAs) across the Savannah River Site (SRS). Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and the Department is issuing this Finding of No Significant Impact. On the basis of the floodplain/wetlands assessment in the EA, DOE has determined that there is no practicable alternative to the proposed activities and that the proposed action has been designed to minimize potential harm to or within the floodplain of the SRS boat ramp. No wetlands on SRS would be affected by the proposed action.
- Research Organization:
- USDOE Savannah River Field Office, Aiken SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 10171787
- Report Number(s):
- DOE/EA-0818; ON: DE93016913; NC: NONE; TRN: 93:021621
- Resource Relation:
- Other Information: PBD: Oct 1992
- Country of Publication:
- United States
- Language:
- English
Similar Records
Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site
Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas