Summary of remedial investigations at the 307 retention basins and 307 trenches (316-3), 300-FF-2 Operable Unit
Remedial investigations at the 307 retention basins and 307 trenches (316-3) in the 300 Area of the Hanford Site were conducted as part of the 300-FF-1 operable unit Phase 1 remedial investigation (RI) in accordance with the approved RI work plan. During the RI, the southwestern boundary of the 300-FF-1 operable unit was modified by all signatories to the Hanford Federal Facility Agreement and Consent Order, which shifted the 307 retention basins and 307 trenches to the 300-FF-3 operable unit. As a consequence, the RI results from these waste management units were not included in the Phase 1 Remedial Investigation Report for the 300-FF-1 Operable Unit. As a results of recent Hanford Federal Facility Agreement and Consent Order negotiations, the 300-FF-2 operable unit now consists of the remaining 300 Area operable units within the 300 Area National Priorities List (NPL), which includes the former 300-FF-3 operable unit. Therefore, this document summarizes the RI results from the 307 retention basins and 307 trenches in the 300-FF-2 operable unit. Analysis and evaluation of these results well be included in the 300-FF-2 RI report.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10169282
- Report Number(s):
- WHC-SD-EN-TI-279; ON: DE94015649; BR: 35AF11201/35AF11202; TRN: 94:014730
- Resource Relation:
- Other Information: PBD: 30 Jun 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT
Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1