skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The AGS New Fast Extracted Beam System orbit bump pulser

Conference ·
OSTI ID:10167894

The AGS New Fast Extracted Beam System (New FEB) is designed for RHIC injection and the g-2 experiment, performing single bunch multiple extraction at the prf of 20 to 100 Hz up to 12 times per AGS cycle. Capacitor-discharge pulsers are required to produce local orbit bumps at the fast kicker and ejector magnet locations. These pulsers have to deliver half-sine current pulses at 1 KA peak with a base width of 5 msec. The discharge voltage will require approximately 800V with a {plus_minus}0.1% accuracy. Direct charging will require a charger too costly and difficult to build because of the high prf. An alternative charging system is being developed to take advantage of the 1.5 sec idle time between each group of pulses. The charger power supply ratings and regulation requirements are thus greatly reduced. The system analysis and results from a prototype will be presented.

Research Organization:
Brookhaven National Lab., Upton, NY (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
10167894
Report Number(s):
BNL-48274; CONF-930511-201; ON: DE93016155; TRN: 93:016462
Resource Relation:
Conference: PAC `93: international particle accelerator conference,Washington, DC (United States),17-20 May 1993; Other Information: PBD: [1993]
Country of Publication:
United States
Language:
English