Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 10154164
- Report Number(s):
- TWR-2276; ON: DE99050600; BR: EW3130010; TRN: AHC29928%%30
- Resource Relation:
- Other Information: PBD: 20 Mar 1998
- Country of Publication:
- United States
- Language:
- English