Concentrator E-F11 water test
This document is the Process Test Report for performing operation testing with water of the modified E-F11 concentrator in PUREX on water. The test was performed to determine the effects of the following concentrator modifications; routing concentrator off-gasses via the PUREX air tunnel to the main stack, blanking of condenser cooling water, blanking of process condensate route to a crib, restricting flow to steam tube bundles, and routing of steam condensate to TK-F12. The test was successful. Concentrator boil-off rates of 6--7 gpm were achieved while the overheads exited the PUREX plant in vapor form. With minor recommended modifications, this process is recommended for use in processing PUREX deactivation flush solutions and other miscellaneous wastes accumulated during the completion of the deactivation project.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10153902
- Report Number(s):
- WHC-SD-WM-PTR-011; ON: DE94012392; BR: 35AF11201/35AF11202; TRN: 94:014836
- Resource Relation:
- Other Information: PBD: 25 Feb 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants
Plutonium concentration and storage, engineering study for Purex L-Cell Package replacement