skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The HEB at flat top: Arranging for the HEB to collider beam transfer

Technical Report ·
DOI:https://doi.org/10.2172/10149459· OSTI ID:10149459

The flat top for the High Energy Booster (HEB) is planned to last for only 6.5 seconds, yet during this time the beam must be made to: (1) have the correct central momentum; (2) have the correct bunch-to-bunch spacing; (3) have the correct central phase; and (4) have the correct momentum spread and longitudinal length. All of these attributes must match what the Collider expects or unwanted emittance growth will occur. This paper outlines the techniques necessary to achieve a proper HEB-to-Collider beam transfer within the 6.5 s time constraint. A novel means for cogging is proposed and evaluated. The hardware necessary to implement the beam manipulation and to achieve the four goals is specified, and tolerances on the hardware are evaluated.

Research Organization:
Superconducting Super Collider Lab., Dallas, TX (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC35-89ER40486
OSTI ID:
10149459
Report Number(s):
SSCL-665; ON: DE94011619; TRN: 94:005473
Resource Relation:
Other Information: PBD: Mar 1994
Country of Publication:
United States
Language:
English