Title: PHENIX WBS notes. Cost and schedule review copy

Technical Report ·
DOI:https://doi.org/10.2172/10147939· OSTI ID:10147939

The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
10147939
Report Number(s):
BNL-60304; ON: DE94011185
Resource Relation:
Other Information: PBD: Feb 1994
Country of Publication:
United States
Language:
English

Similar Records

PHENIX Work Breakdown Structure. Cost and schedule review copy
Technical Report · Tue Feb 01 00:00:00 EST 1994 · OSTI ID:10147939

AES6.1. Automated Estimating System
Technical Report · Fri Mar 01 00:00:00 EST 1996 · OSTI ID:10147939

Automated Estimating System