Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation
This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU.
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC05-84OR21400
- OSTI ID:
- 10139568
- Report Number(s):
- DOE/OR-01-1254-D1; ORNL/ER-232-D1; ON: DE94009444; TRN: 94:007529
- Resource Relation:
- Other Information: PBD: Mar 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan
Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan. Energy Systems Environmental Restoration Program; Clinch River Environmental Restoration Program
Related Subjects
CLINCH RIVER
REMEDIAL ACTION
SEDIMENTS
SAMPLING
CHEMICAL ANALYSIS
SURFACE WATERS
FISHES
SITE CHARACTERIZATION
ORGANIC COMPOUNDS
METALS
RADIOISOTOPES
RISK ASSESSMENT
HUMAN POPULATIONS
HEALTH HAZARDS
540330
540320
540350
RADIOACTIVE MATERIALS MONITORING AND TRANSPORT
CHEMICALS MONITORING AND TRANSPORT