skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Development of the LICADO coal cleaning process. Final report, October 1, 1987--April 2, 1990

Technical Report ·
DOI:https://doi.org/10.2172/10138837· OSTI ID:10138837

Development of the liquid carbon dioxide process for the cleaning of coal was performed in batch, variable volume (semi-continuous), and continuous tests. Continuous operation at feed rates up to 4.5 kg/hr (10-lb/hr) was achieved with the Continuous System. Coals tested included Upper Freeport, Pittsburgh, Illinois No. 6, and Middle Kittanning seams. Results showed that the ash and pyrite rejections agreed closely with washability data for each coal at the particle size tested (-200 mesh). A 0.91 metric ton (1-ton) per hour Proof-of-Concept Plant was conceptually designed. A 181 metric ton (200 ton) per hour and a 45 metric ton (50 ton) per hour plant were sized sufficiently to estimate costs for economic analyses. The processing costs for the 181 metric ton (200 ton) per hour and 45 metric ton (50 ton) per hour were estimated to be $18.96 per metric ton ($17.20 per ton) and $11.47 per metric ton ($10.40 per ton), respectively for these size plants. The costs for the 45 metric ton per hour plant are lower because it is assumed to be a fines recovery plant which does not require a grinding circuit of complex waste handling system.

Research Organization:
Westinghouse Electric Corp., Pittsburgh, PA (United States). Advanced Energy Systems Div.
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC22-87PC79873
OSTI ID:
10138837
Report Number(s):
DOE/PC/79873-T1; ON: DE92013482
Resource Relation:
Other Information: PBD: 31 Jul 1990
Country of Publication:
United States
Language:
English