skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Recovery of bypassed oil in the Dundee Formation using horizontal drains. Annual report, April 1994--June 1995

Technical Report ·
DOI:https://doi.org/10.2172/101329· OSTI ID:101329

Crystal Field in Montcalm County, MI, was selected as a field trial site for this project. Analysis of production data for Crystal Field suggests that an additional 200,000 bbls of oil can be produced using one strategically located horizontal well. Total addition production from the Crystal Field could be as much as 6--8 MMBO. Application of the technology developed in this project to other Dundee fields in the area has the potential to increase Dundee production in Michigan by 35%, adding 80--100 MMBO to ultimate recovery. This project will demonstrate through a field trial that horizontal wells can be substantially increase oil production in older reservoirs that are at or near their economic limit. To maximize the potential of the horizontal well and to ensure that a comprehensive evaluation can be made, extensive reservoir characterization will be performed. In addition to the proposed field trial at Crystal Field, 29 additional Dundee fields in a seven-county area have been selected for study in the reservoir characterization portion of this project.

Research Organization:
Michigan Technological Univ., Houghton, MI (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC22-94BC14983
OSTI ID:
101329
Report Number(s):
DOE/BC/14983-5; ON: DE95000181
Resource Relation:
Other Information: PBD: Aug 1995
Country of Publication:
United States
Language:
English