Title: The Hazardous Waste/Mixed Waste Disposal Facility

Abstract

The Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF) will provide permanent Resource Conservation and Recovery Act (RCRA) permitted storage, treatment, and disposal for hazardous and mixed waste generated at the Department of Energy`s (DOE) Savannah River Site (SRS) that cannot be disposed of in existing or planned SRS facilities. Final design is complete for Phase I of the project, the Disposal Vaults. The Vaults will provide RCRA permitted, above-grade disposal capacity for treated hazardous and mixed waste generated at the SRS. The RCRA Part B Permit application was submitted upon approval of the Permit application, the first Disposal Vault is scheduled to be operational in mid 1994. The technical baseline has been established for Phase II, the Treatment Building, and preliminary design work has been performed. The Treatment Building will provide RCRA permitted treatment processes to handle a variety of hazardous and mixed waste generated at SRS in preparation for disposal. The processes will treat wastes for disposal in accordance with the Environmental Protection Agency`s (EPA`s) Land Disposal Restrictions (LDR). A RCRA Part B Permit application has not yet been submitted to SCDHEC for this phase of the project. The Treatment Building is currently scheduled to be operational in late 1996.

Authors:
Publication Date:
Research Org.:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10131267
Report Number(s):
WSRC-MS-91-128; CONF-910849-8
ON: DE92009600
DOE Contract Number:  
AC09-89SR18035
Resource Type:
Conference
Resource Relation:
Conference: 1. international mixed waste symposium,Baltimore, MD (United States),26-29 Aug 1991; Other Information: PBD: [1991]
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; SAVANNAH RIVER PLANT; RADIOACTIVE WASTE FACILITIES; RADIOACTIVE WASTES; RADIOACTIVE WASTE MANAGEMENT; HAZARDOUS MATERIALS; MIXTURES; RADIOACTIVE WASTE PROCESSING; RADIOACTIVE WASTE DISPOSAL; RADIOACTIVE WASTE STORAGE; DESIGN; 052001; 052002; WASTE PROCESSING; WASTE DISPOSAL AND STORAGE

Citation Formats

Bailey, L L. The Hazardous Waste/Mixed Waste Disposal Facility. United States: N. p., 1991. Web.
Bailey, L L. The Hazardous Waste/Mixed Waste Disposal Facility. United States.
Bailey, L L. 1991. "The Hazardous Waste/Mixed Waste Disposal Facility". United States. https://www.osti.gov/servlets/purl/10131267.
@article{osti_10131267,
title = {The Hazardous Waste/Mixed Waste Disposal Facility},
author = {Bailey, L L},
abstractNote = {The Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF) will provide permanent Resource Conservation and Recovery Act (RCRA) permitted storage, treatment, and disposal for hazardous and mixed waste generated at the Department of Energy`s (DOE) Savannah River Site (SRS) that cannot be disposed of in existing or planned SRS facilities. Final design is complete for Phase I of the project, the Disposal Vaults. The Vaults will provide RCRA permitted, above-grade disposal capacity for treated hazardous and mixed waste generated at the SRS. The RCRA Part B Permit application was submitted upon approval of the Permit application, the first Disposal Vault is scheduled to be operational in mid 1994. The technical baseline has been established for Phase II, the Treatment Building, and preliminary design work has been performed. The Treatment Building will provide RCRA permitted treatment processes to handle a variety of hazardous and mixed waste generated at SRS in preparation for disposal. The processes will treat wastes for disposal in accordance with the Environmental Protection Agency`s (EPA`s) Land Disposal Restrictions (LDR). A RCRA Part B Permit application has not yet been submitted to SCDHEC for this phase of the project. The Treatment Building is currently scheduled to be operational in late 1996.},
doi = {},
url = {https://www.osti.gov/biblio/10131267}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Dec 31 00:00:00 EST 1991},
month = {Tue Dec 31 00:00:00 EST 1991}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: