Title: Scaleup tests and supporting research for the development of duct injection technology: Topical report No. 7, Task 4.1: Testing of first generation mathematical model predictions; Topical report No. 8, Task 4.2: Testing of second generation mathematical model predictions, Duct Injection Test Facility, Muskingum River Power Plant, Beverly, OH

Technical Report ·
DOI:https://doi.org/10.2172/10129202· OSTI ID:10129202
;  [1]; ;  [2]
  1. Southern Research Inst., Birmingham, AL (United States)
  2. Gilbert/Commonwealth, Inc., Reading, PA (United States)

Gilbert/Commonwealth (G/C) and Southern Research Institute have completed a project under DOE sponsorship entitled ``Scaleup Tests and Supporting Research for the Development of Duct Injection Technology``. The project included extensive modifications to DOE`s Duct Injection Test Facility (DITF) located at the Muskingum River Plant of Ohio Power Company. A comprehensive test program was performed at the facility to evaluate So{sub 2} removal and overall process operability with duct injection of slaked lime slurries and dry injection of calcium hydroxide powder with humidification. Detailed results from the project are presented in the following reports: Topical Report No. 1 -- Literature Review; Topical Report No. 2 -- Evaluation of System Performance; Topical Report No. 3 -- Scale-Up Testing; Advanced Configurations Process Controls; Failure Modes; and Waste characterization. Project Final Report. The purposes of this report are: (1) to satisfy a contractual requirement for a separate topical report concerning the subject of mathematical model validation, and (2) to briefly describe the status of the model development and validation effort.

Research Organization:
Gilbert/Commonwealth, Inc., Reading, PA (United States); Southern Research Inst., Birmingham, AL (United States); American Electric Power Service Corp., Columbus, OH (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC22-88PC88851
OSTI ID:
10129202
Report Number(s):
DOE/PC/88851-T3; SRI-ENV-92-634-6715-T4; G/C-2787-4; ON: DE93008942
Resource Relation:
Other Information: PBD: Aug 1992
Country of Publication:
United States
Language:
English

Similar Records

Scaleup tests and supporting research for the development of duct injection technology: Topical report No. 7, Task 4. 1: Testing of first generation mathematical model predictions; Topical report No. 8, Task 4. 2: Testing of second generation mathematical model predictions, Duct Injection Test Facility, Muskingum River Power Plant, Beverly, OH
Technical Report · Sat Aug 01 00:00:00 EDT 1992 · OSTI ID:10129202

Scaleup tests and supporting research for the development of duct injection technology: Topical report No. 3, Task 3. 2: Scale-up testing; Topical report No. 4, Task 3. 3: Advanced configurations; Topical report No. 5, Task 3. 4: Process controls; Topical report No. 6, Task 3. 5: Failure modes; Task 3. 6: Waste characterization, Duct Injection Test Facility, Muskingum River Power Plant, Beverly, Ohio
Technical Report · Sat Aug 01 00:00:00 EDT 1992 · OSTI ID:10129202

Scaleup tests and supporting research for the development of duct injection technology: Topical report No. 3, Task 3.2: Scale-up testing; Topical report No. 4, Task 3.3: Advanced configurations; Topical report No. 5, Task 3.4: Process controls; Topical report No. 6, Task 3.5: Failure modes; Task 3.6: Waste characterization, Duct Injection Test Facility, Muskingum River Power Plant, Beverly, Ohio
Technical Report · Sat Aug 01 00:00:00 EDT 1992 · OSTI ID:10129202